|
| Name: _________________________ | Period: ___________________ |
This quiz consists of 5 multiple choice and 5 short answer questions through Pages 21 - 40.
Multiple Choice Questions
1. For what do they cut timber?
(a) The construction of the cathedral.
(b) The construction of the scaffolding and tools.
(c) The construction of scaffolding, workshops, tools, and machines.
(d) The construction of the carts to haul supplies.
2. This technique also allowed for more space for ___________.
(a) Windows.
(b) Crown molding.
(c) Tapestries.
(d) Statues.
3. Once the foundation is completed what are begun?
(a) The walls.
(b) The floor tiles.
(c) The Pews.
(d) The sculptures.
4. _______ walls span some portions of the cathedrals.
(a) Semi-solid.
(b) Hollow.
(c) Solid.
(d) Transparent.
5. What are used to transport the materials through the city to the work site?
(a) Slaves.
(b) Boats.
(c) Carts.
(d) Mules.
Short Answer Questions
1. The master quarryman supervises about ____________ men cutting limestone.
2. The masons place the stones while who mix and apply the mortar?
3. What do the various dashed lines between the piers on the floor plan show?
4. In most respects, what are the two drawings typical of?
5. What halts construction for five months?
|
This section contains 191 words (approx. 1 page at 300 words per page) |
|



