Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 eBook

This eBook from the Gutenberg Project consists of approximately 54 pages of information about Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910.

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 eBook

This eBook from the Gutenberg Project consists of approximately 54 pages of information about Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910.
(1)     (2)          (9)     (10)   (11)      (12)       (13)
____________________________________________________________
____ | A {L 2 + 75.3} | | | | | | | {L 3 + 25.3} | 430.09 | 482.75 | 1.12 | 5/18/05 | 5/25/05 | | B {L 3 + 25.3} | | | | | | | {L 3 + 74.9} | 104.85 | 125.50 | 1.20 | 6/14/05 | 6/16/05 | | C {169 + 30.8} | | | | | | | {169 + 74.8} | 163.59 | 183.00 | 1.12 | 7/10/05 | 7/13/05 | | D {169 + 74.8} | | | | | | | {170 + 28.8} | 104.95 | 119.25 | 1.14 | 7/14/05 | 7/19/05 | | E {168 + 83.6} | | | | | | | {169 + 30.8} | 92.55 | 107.25 | 1.16 | 7/26/05 | 7/28/05 | | F {L 2 + 78.2} | | | | | | | {L 3 + 19.6} | 335.60 | 397.75 | 1.18 | 9/19/05 | 9/24/05 | | G {L 3 + 19.6} | | | | | | | {L 3 + 56.9} | 228.42 | 278.00 | 1.22 | 9/26/05 | 9/29/05 | | H {L 3 + 56.9} | | | | | | | {168 + 83.5} | 23.16 | 28.00 | 1.21 | 9/29/05 | 9/29/05 | |_________________|________|________|______|__________|_____
_____|
Seventh Avenue.
____________________________________________________________
____ | 54 {164 + 27.6} | | | | | | | {L 2 + 32.0} | 739.72 | 907.50 | 1.23 | 8/6/06 | 8/15/06 | | 57 {L 2 + 10.3} | | | | | | | {L 2 + 32.0} | 520.72 | 610.75 | 1.17 | 9/10/06 | 9/15/06 | | 58 {L 1 + 87.1} | | | | | | | {L 2 + 10.3} | 523.09 | 588.25 | 1.12 | 9/24/06 | 9/28/06 | | 62 {L 1 + 87.1} | | | | | | | {L 1 + 64.4} | 538.24 | 639.50 | 1.19 | 10/24/06 | 10/29/06 | | 63 {L 1 + 42.4} | | | | | | | {L 1 + 64.4} | 581.99 | 678.50 | 1.17 | 11/5/06 | 11/11/06 | | 72 {L 1 + 42.4} | | | | | | | {L 1 + 19.6} | 619.98 | 719.50 | 1.16 | 4/25/07 | 4/30/07 | | 73 {L 1 + 19.6} | | | | | | | {L 0 + 97.0} | 562.18 | 685.75 | 1.22 | 5/13/07 | 5/18/07 | |_________________|________|________|______|__________|_____
_____|

NOTE.—­The number of cubic yards of crushed stone used in any section can be found by multiplying the figure for that section in Column 10 by 0.7778.  The number of cubic yards of sand used in any section can be found by multiplying the sum of the figures for that section in Columns 4, 6, and 10 by 0.3889.

Channeling with a 10-ft quarry bar, carrying a No. 4 Ingersoll-Rand drill with Z-bits, was attempted in place of the close drilling below the walls, but, as the rock stood so nearly vertical and was full of soft seams, very little could be accomplished, the average cut per day of 10 hours, counting the time of moving and setting up, was only 4 sq. ft., and, after a thorough trial, the bars were abandoned.

Copyrights
Project Gutenberg
Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 from Project Gutenberg. Public domain.