BookRags.com Literature Guides Literature
Guides
Criticism & Essays Criticism &
Essays
Questions & Answers Questions &
Answers
Lesson Plans Lesson
Plans
My Bibliography Periodic Table U.S. Presidents Shakespeare Sonnet Shake-Up
Research Anything:        
History | Encyclopedias | Films | News | Create a Bibliography | More... Login | Register | Help
Not What You Meant?  There are 73 definitions for Silver.

Silver Line (Washington Metro)

Print-Friendly
About 7 pages (2,055 words)

Bookmark and Share Questions on this topic? Just ask!
      Dulles Corridor Metrorail Project
Info
Type Rapid transit
System Metrorail (Washington, D.C.)
Status Planned
Locale Washington Metropolitan Area
Terminals Route 772 (west)
Stadium–Armory (east)
No. of stations 30
Operation
Opened 2013
Operator(s) Washington Metropolitan Area Transportation Authority
Character Underground, surface, and elevated
Technical
Line length 23 mi (37 km)
No. of tracks 2
Gauge 1,435 mm (4 ft 8½ in)
Electrification Third rail
Metrorail lines
  Red Line
  Orange Line
  Blue Line
  Yellow Line
  Green Line
  Silver Line (Planned)

The Dulles Corridor Metrorail Project, informally dubbed the Silver Line due to its color on maps, is a planned extension of the Washington Metro rapid transit system, consisting of 29 stations from Route 772 in Loudoun County, Virginia to Stadium-Armory in Washington, D.C.. The current plan calls for stations in Loudoun, Fairfax, and Arlington counties in Virginia, and the District of Columbia. Eighteen stations will be shared with the Orange Line, including all thirteen shared between the Orange and Blue Lines from Rosslyn to Stadium-Armory. All construction will be in Virginia; the section in Washington D.C. to be shared with the Orange and Blue lines was completed in the 1970s. The Silver Line has two primary goals. The first is to link the District of Columbia by rail to Dulles International Airport and the edge cities of Tysons Corner, Reston, Herndon, and Ashburn. The second is to spur urban development in Tysons Corner and reduce overall reliance on vehicle traffic in the business district, Virginia's largest and the 12th-largest in the nation. This will be a great challenge for an area that is comparable in size to downtown Washington, D.C., but is rather insulated from its surrounding neighborhoods and has no existing grid pattern in its streets. Unlike all prior segments of the Metrorail system, which were designed and constructed by the WMATA, this line will be designed and constructed by the Metropolitan Washington Airports Authority and operated by WMATA. The project is funded 43% by $900 million of federal funding, 28% by a special tax district on commercial property proximate to the Silver Line route, and 28% by a $0.50 toll increase on the Dulles Toll Road.[1]

Contents

History

The federal government – which, before Congress created the Metropolitan Washington Airports Authority, owned and operated Dulles Airport – built the Dulles Access Road in the 1960s to connect the airport to Washington by way of Interstate 66. The government opted, as the access road was built, to reserve the median of the road for some form of rail transit.[2] Local residents and officials had talked of a Metro extension to Dulles since the Washington Metro began service in 1976, but a significant plan only developed in 2000. The Dulles Corridor Rapid Transit Project "scoping" process began in April 2000 with a series of meetings with local and federal officials, designed to collect the necessary authorities for the project. Local and federal law required extensive analysis of alternatives -- the two most likely being bus lanes or inaction -- and of the environmental impact. The rail-only line won over the other alternatives. Initial environmental hearings, which closed on August 28, 2002, were positive. The project received formal approval on June 10, 2004. Although construction was set to begin in 2005, delays in funding have pushed back the start date for construction to late 2007. The extension will run in its own right-of-way on a route similar to that of the Dulles Access Road, running above ground both at grade and via aerial structure. The only significant diversions from the access road route are for the stops in Tysons Corner and at Dulles International Airport, where the Metro will alternate between subway and elevated track to maintain the exclusive right-of-way. Service on the Silver Line is expected to begin in 2013[3] between Wiehle Avenue and Stadium-Armory, with five new stations being added to the existing network west of East Falls Church. The full line to Route 772, including a station at Dulles International Airport, is expected to be completed in 2016.[3] There will also be a provision made for a future in-fill station at Wolf Trap, between Wiehle Avenue and Tysons West.

Controversies

There has been controversy over the contract between the Metropolitan Washington Airports Authority and the contractor, Dulles Transit Partners, which consists of Bechtel and Washington Group International. As part of the Virginia Public-Private Partnership, this $2,700,000,000 project has not been bid out, and there is no upper cap on its cost. The state has refused to make details of the contract publicly available.[4] The contract provides for price escallation of $3 million to $6 million a month for delays.[5] The method of construction through the Tysons Corner area generated much debate. In the end, however, plans were made to build the extension above ground. Early plans called for a tunnel running from before Tysons East to beyond Tysons West with all four stations in between being below ground. When the contractor hired to design the Silver Line—a consortium of Bechtel and Washington Group International—found the costs to be too high, the design was changed to use a short tunnel only between Tysons 123 and Tysons 7 stations (underneath higher ground)with all four stations being at or above ground.[6] In March 2006, the contractor was ordered to examine an alternative "large bore" tunnel digging technique (successfully used in Europe) with the potential to lower costs of a tunnel through the entire Tysons section. The contractor found that there would not be a significant cost reduction and proposed staying with the short tunnel option.[7] In April 2006, the long tunnel concept was revived after allegations that the design contractor had inflated costs for the tunnel in order to avoid sharing the job with an outside tunneling contractor. The allegations led to calls for an outside cost estimate to determine more realistic tunnel costs.[8] On May 15, 2006, Virginia Transportation Secretary Pierce R. Homer announced the creation of an advisory panel headed by the American Society of Civil Engineers. The panel had about two months to evaluate options for completing the line through Tysons Corner,[9] with the results presented to the state on July 27, 2006[10] and published on July 31, 2006.[11] On September 6, 2006, Virginia Governor Tim Kaine announced his decision in favor of an elevated track through Tysons Corner. In his statement, Kaine said he believed a tunnel would be the best option, but decided against it, citing a fear of losing federal funding for the project.[3] However, Virginia has until May 2008 to submit their final proposal to the Federal Transit Administration (FTA).[12] The tunnel controversy, however, is not over. Shortly after Governor Kaine's decision, the Greater McLean Chamber of Commerce formed a coalition of tunnel supporters and put forth a technical proposal to help revive consideration of building a tunnel through Tysons Corner.[13] The Virginia Department of Rail and Public Transportation hired an independent consultant to assess the coalition's proposal. The consultant's report—sent on March 7, 2007, to Secretary Homer—stated, however, that "[t]here is a significant risk that the project cost of a Large Bore Tunnel would not meet the Federal Transit Administration’s Cost Effectiveness ratio criteria, which could compromise federal funding for the project."[14][15]. The independence of that consultant, however, was queried in the press. On November 26, 2007, Tysons Tunnel, Inc. filed a lawsuit against the United States Department of Transportation and the FTA in the Eastern District of Virginia challenging the denial of their petition to reopen and consider additional evidence regarding the benefits of a tunnel over the aerial option. Gary Baise, the Republican challenger to Gerry Connolly's Fairfax County's Board of Supervisor's Chairmanship, represents Tysons Tunnel.[16] Start of construction has been delayed as approval of the $900 million federal contribution to project costs awaits the conclusion of a review by FTA of the proposal submitted by Virginia.

List of planned stations, west to east

Metro system map showing the Silver Line
Metro system map showing the Silver Line

See also

References

  1. ^ http://www.dullesmetro.com/info/faqs.cfm#4
  2. ^ Virginia Department of Rail and Public Transportation, Dulles Metrorail History. Accessed on August 12, 2006.
  3. ^ a b c Alec MacGillis. "No Tunnel For Tysons, Kaine Says", The Washington Post, 7 September 2006, p. A01. 
  4. ^ "State refuses to turn over Dulles rail agreement documentation", The Examiner, 9 April 2007, p. A01. 
  5. ^ "Costs to Rise for Metrorail to Dulles" Washington Post p. C4 2007-08-05.
  6. ^ Gene Thorp. "Rail Tunnel Graphic", The Washington Post, April 26, 2006. 
  7. ^ "Cost Dooms Metro Plan For Tunnel At Tysons", The Washington Post, 24 March 2006, p. A01. 
  8. ^ "Tunnel Back On Table for Dulles Rail", The Washington Post, 26 April 2006, p. A01. 
  9. ^ "Tunnel Decision Delayed 2 Months", The Washington Post, May 16, 2006, p. B01. 
  10. ^ "Wolf, Davis Say Tunnel May Delay Dulles Rail", The Washington Post, 27 July 2006, p. A01. 
  11. ^ American Society of Civil Engineers (31 July 2006). "PANEL SAYS TUNNEL IS FEASIBLE FOR TYSONS CORNER". Press release.
  12. ^ "TysonsTunnel.org Petitions FTA For Full and Open Competition, Environmental and Independent Reviews of the Tunnel Option". 
  13. ^ TysonsTunnel.org (1 December 2006).
  14. ^ Carter & Burgess, Inc. (2007-01-22). "Review of Large Bore Tunnel Engineering and Environmental Studies from Tysons Tunnel, Inc." (PDF) p. 41. Retrieved on March 19, 2007.
  15. ^ Tucker, Matthew O. Director (2007-03-07). Cover letter to consultant report, transmitted to Virginia Secretary of State (PDF). Department of Rail and Public Transportation, Commonwealth of Virginia. Retrieved on March 19, 2007.
  16. ^ http://www.fairfaxtimes.com/news/2007/nov/27/tysons-tunnel-sues-fta/

External links

News articles

View More Summaries on Silver Line (Washington Metro)
 
Ask any question on Silver Line (Washington Metro) and get it answered FAST!
Answer questions in BookRags Q&A and earn points toward
discounted or even FREE Study Guides and other BookRags products!
Learn more about BookRags Q&A
Copyrights
Silver Line (Washington Metro) from Wíkipedia. ©2006 by Wíkipedia. Licensed under the GNU Free Documentation License. View a list of authors or edit this article.

Article Navigation
Join BookRagslearn moreJoin BookRags




About BookRags | Customer Service | Report an Error | Terms of Use | Privacy Policy