BookRags.com Literature Guides Literature
Guides
Criticism & Essays Criticism &
Essays
Questions & Answers Questions &
Answers
Lesson Plans Lesson
Plans
My Bibliography Periodic Table U.S. Presidents Shakespeare Sonnet Shake-Up
Research Anything:        
History | Encyclopedias | Films | News | Create a Bibliography | More... Login | Register | Help
Not What You Meant?  There are 84 definitions for Perry.

Perry Nuclear Generating Station

Print-Friendly
About 3 pages (774 words)

Bookmark and Share Questions on this topic? Just ask!
NRC Region Three
(Midwest)
Illinois
 Braidwood
 Byron
 Clinton
 Dresden
 LaSalle County
 Quad Cities
Iowa
 Duane Arnold
Michigan
 Donald C. Cook
 Enrico Fermi
 Palisades
Minnesota
 Monticello
 Prairie Island
Ohio
 Davis-Besse
 Perry
Wisconsin
 Kewaunee
 Point Beach

The Perry Nuclear Power Plant is a General Electric boiling water reactor owned by First Energy Nuclear Operating Corporation and located on 1,100 acres (450 ha) outside of Cleveland in North Perry, Ohio, USA. The reactor is a BWR-6 design, with a Mark III containment design. The original core power level of 3579 megawatts thermal was increased to 3758 megawatts thermal in 2000, making Perry one of the largest BWRs in the United States. Built at a cost of $6 billion, Perry-1 is one of the most expensive power plants ever constructed. Perry was originally designed as a two-unit installation, but construction on Unit 2 was suspended in 1985 and formally cancelled in 1994. At the time of cancellation, all of the major buildings and structures for the second unit were completed, including the 500 foot tall cooling tower. Aerial pictures of Perry show what appears to be two nuclear units. The completed sections have since been raided for spare parts to maintain Unit 1. It is theoretically possible that a second unit could be constructed on the site, but current economical and regulatory conditions are not conducive to doing so. At any rate, the second unit would have to be re-built from the ground up to accommodate the newer reactor design that would almost certainly be installed. Perry was the 100th power reactor licensed in the United States. In addition to Perry, FirstEnergy also owns and operates the Davis-Besse and Beaver Valley nuclear plants.

  Unit 1 Unit 2
Reactor Type BWR-6 BWR-6
Reactor Manufacturer General Electric General Electric
Turbine Manufacturer General Electric General Electric
Thermal Power 3,758 megawatts Unit canceled in 1994
Electrical Output 1,260 megawatts Unit canceled in 1994
Transmission System Connection 345,000 volts Unit canceled in 1994
Construction Permit Issued May 3, 1977 May 3, 1977 (construction suspended in 1985)
Initial Criticality June, 1986 Unit canceled in 1994
First Electrical Generation November 13, 1986 Unit canceled in 1994
Operational Date November, 1987 Unit canceled in 1994
Expiration of Original License March 18, 2026 Unit canceled in 1994

External links

View More Summaries on Perry Nuclear Generating Station
 
Ask any question on Perry Nuclear Generating Station and get it answered FAST!
Answer questions in BookRags Q&A and earn points toward
discounted or even FREE Study Guides and other BookRags products!
Learn more about BookRags Q&A
Copyrights
Perry Nuclear Generating Station from Wíkipedia. ©2006 by Wíkipedia. Licensed under the GNU Free Documentation License. View a list of authors or edit this article.

Article Navigation
Join BookRagslearn moreJoin BookRags




About BookRags | Customer Service | Report an Error | Terms of Use | Privacy Policy