BookRags.com Literature Guides Literature
Guides
Criticism & Essays Criticism &
Essays
Questions & Answers Questions &
Answers
Lesson Plans Lesson
Plans
My Bibliography Periodic Table U.S. Presidents Shakespeare Sonnet Shake-Up
Research Anything:        
History | Encyclopedias | Films | News | Create a Bibliography | More... Login | Register | Help
Not What You Meant?  There are 17 definitions for MOP.

Massive Ordnance Penetrator

Print-Friendly
About 2 pages (605 words)

Bookmark and Share Know this topic well? Help others and get FREE products!
MOP being offloaded in preparation for its first explosive test
MOP being offloaded in preparation for its first explosive test
MOP in tunnel at White Sands Missile Range before its first explosive test
MOP in tunnel at White Sands Missile Range before its first explosive test

The Massive Ordnance Penetrator (MOP) project is a proposal by the US Air Force to develop a massive, precision-guided, 30,000 lb (13,600 kg) 'bunker buster' bomb. This is substantially larger than the deepest penetrating bunker buster presently available, the 5000 lb (2,270 kg) GBU-28.

Contents

Development

In 2002, Northrop Grumman and Lockheed Martin were working on the development of a 30,000 lb earth penetrating weapon, said to be known as "Big BLU", although funding and technical difficulties resulted in the development work being abandoned. Following the 2003 invasion of Iraq, analysis of sites which had been targeted with bunker buster bombs revealed that the then currently available penetrating weapons were incapable of completely destroying some deep underground structures. This reignited interest in the development of a super-large bunker buster, and the MOP project was initiated. The US Air Force has no specific military requirement for an ultra-large bomb, but it does have a concept for a collection of massively sized penetrator and blast weapons, the so-called 'Big BLU' collection, which includes the MOAB (Massive Ordnance Air Burst) bomb. Development of the MOP is now underway at the Air Force Research Laboratory, Munitions Directorate, Eglin Air Force Base, Florida. Design and testing work is also being performed by Boeing. It is intended that the bomb will be deployed on B-2[1] or B-1 bombers, and will be guided by the use of GPS. American stealth bombers will soon be equipped to drop the Massive Ordnance Penetrator (MOP) Northrop Grumman have announced the $2.5 million stealth-bomber refit contract on September 19th, 2007. An undisclosed number of the US Air Force's 22 B-2's will each be able to carry two 15 metric ton MOPs.[2]

Specifications

Program status

The initial explosive test of MOP took place on March 14, 2007 in a tunnel belonging to the Defense Threat Reduction Agency (DTRA) at the White Sands Missile Range, New Mexico. The exact location of the tunnel was not announced, but comparison of a photograph of the site with aerial photography suggests it was at the DTRA Capitol Peak Tunnel Complex in the vicinity of 33°26′24″N 106°27′18″W / 33.44, -106.455 (broken link).

Notes

See also

External links

View More Summaries on Massive Ordnance Penetrator
 
Ask any question on Massive Ordnance Penetrator and get it answered FAST!
Answer questions in BookRags Q&A and earn points toward
discounted or even FREE Study Guides and other BookRags products!
Learn more about BookRags Q&A
Copyrights
Massive Ordnance Penetrator from Wíkipedia. ©2006 by Wíkipedia. Licensed under the GNU Free Documentation License. View a list of authors or edit this article.

Article Navigation
Join BookRagslearn moreJoin BookRags




About BookRags | Customer Service | Report an Error | Terms of Use | Privacy Policy