BookRags.com Literature Guides Literature
Guides
Criticism & Essays Criticism &
Essays
Questions & Answers Questions &
Answers
Lesson Plans Lesson
Plans
My Bibliography Periodic Table U.S. Presidents Shakespeare Sonnet Shake-Up
Research Anything:        
History | Encyclopedias | Films | News | Create a Bibliography | More... Login | Register | Help

LINK Train

Print-Friendly
About 2 pages (553 words)

Bookmark and Share Questions on this topic? Just ask!
LINK Train
Info
Type People mover
Locale Toronto Pearson International Airport, Toronto, Canada
Terminals Terminal 1
Viscount
No. of stations 3
Service routes 1
Operation
Opened July 6, 2006
Owner Greater Toronto Airport Authority
Operator(s) Greater Toronto Airport Authority
Rolling stock Doppelmayr APM Cable Liner
Technical
Line length 1.47 km (0.91 mi)
Highest elevation Elevated
Line map
KBFa FLUG
Terminal 1
BHF FLUG
Terminal 3
KBFe leer
Viscount
LINK lines at Pearson Airport
LINK lines at Pearson Airport

The LINK Train is an automated people mover service which connects Terminals 1 and 3 at Toronto Pearson International Airport in Toronto, Canada. It opened on July 6, 2006, replacing a shuttle bus service. The train runs 24 hours a day, 7 days a week and is wheelchair accessible.

Contents

Service

The service currently uses two trains of six cars each, built by DCC Doppelmayr Cable Car GmbH and Company of Wolfurt, Austria. They use a drive and tension system. Each train has capacity for 150 passengers with baggage (25 per car - 17 standing, 8 seated) or 2,150 per hour per direction. Travel time is 3.5 minutes one way. If ridership increases beyond the capabilities of the system, the stations have been built to accommodate seven-car trains, increasing capacity to 175 passengers per train.

Vehicles

  • 2 Doppelmayr APM Cable liner shuttle Handicapped/disabled access - 6-car set

The same cars are currently used in the Mandalay Bay Resort and Casino in Las Vegas, Nevada and at Birmingham International Airport, Birmingham, England.

Stations

  • Terminal 1
  • Terminal 3
  • Viscount (Long-term parking on Viscount Road)

The two lines, running side-by-side, are 1.46 km and 1.47 km long.

Previous shuttle bus

Prior to 2003 a shuttle bus service was operated betwen the terminals by contractor Penetang-Midland Coach Lines (PMCL). Retired bus fleet include:

External links

View More Summaries on LINK Train
 
Ask any question on LINK Train and get it answered FAST!
Answer questions in BookRags Q&A and earn points toward
discounted or even FREE Study Guides and other BookRags products!
Learn more about BookRags Q&A
Copyrights
LINK Train from Wíkipedia. ©2006 by Wíkipedia. Licensed under the GNU Free Documentation License. View a list of authors or edit this article.

Article Navigation
Join BookRagslearn moreJoin BookRags




About BookRags | Customer Service | Report an Error | Terms of Use | Privacy Policy