BookRags.com Literature Guides Literature
Guides
Criticism & Essays Criticism &
Essays
Questions & Answers Questions &
Answers
Lesson Plans Lesson
Plans
My Bibliography Periodic Table U.S. Presidents Shakespeare Sonnet Shake-Up
Research Anything:        
History | Encyclopedias | Films | News | Create a Bibliography | More... Login | Register | Help
Not What You Meant?  There are 73 definitions for Silver.

Jubilee line

Print-Friendly
About 7 pages (2,019 words)

Bookmark and Share Questions on this topic? Just ask!
Jubilee
Colour on map Grey
Year opened 1979
Line type Deep Level
Rolling stock 1996 Tube Stock
Stations served 27
Length (km) 36.2
Length (miles) 22.5
Depots Stratford Market
Journeys made 127,584,000 (per annum)
Rail lines of
Transport for London
London Underground lines
  Bakerloo
  Central
  Circle
  District
  East London
  Hammersmith & City
  Jubilee
  Metropolitan
  Northern
  Piccadilly
  Victoria
  Waterloo & City
Other lines
  Docklands Light Railway
  Tramlink
  Overground
Portal:London Transport London Transport Portal

The Jubilee line is a line on the London Underground ("the Tube"), in England. It was built in two major sections - initially to Charing Cross in Central London, and later extended in 1999 to Stratford in East London. The Jubilee line Extension stations are generally notable for their exceptional size and safety features (both being attempts to future-proof the line). Out of 27 stations served, 13 are underground. The Jubilee line is coloured silver/grey on the Tube map.

Contents

Before the Jubilee line

The Metropolitan main line had been extended from Wembley Park to Stanmore, opening in 1932. The line, as with many others in the north-west London area, was designed to absorb commuter traffic from the new and rapidly expanding suburbs. The line presented the Metropolitan with a problem — so successful was the suburban traffic that by the early 1930s, the lines into Baker Street were becoming overloaded, not least by the post-war flight from the City to the West End. The solution presented was an extension of the Bakerloo line, north from Baker Street to serve St. John's Wood and Swiss Cottage, thereby rendering the existing stations (St. John's, Marlborough Road and Swiss Cottage) on the parallel route, redundant. The line would rise between the Metropolitan tracks at Finchley Road, providing cross-platform interchange with the Metropolitan line. Continuing north to Wembley Park, the Bakerloo was to provide intermediate service on the Metropolitan line, allowing its own trains to run Wembley Park to Finchley Road non-stop, cutting seven minutes from main-line Metropolitan journeys. At Wembley Park, the Bakerloo would run on to serve Stanmore. The Bakerloo extension, built as above, opened in 1939. The immediately pre- and post-war planning for the Tube network considered a series of new routes. The main results of this study concerned two major routes: the south to north-east "line C" (later constructed as the Victoria line) and lines 3 and 4, new cross-town routes, linking the north-east suburbs to Fenchurch Street, Wapping and variously Lewisham and Hayes. Line C opened as the Victoria line, in stages, between 1968 and 1972. Work on the north-east - south-west continued, and in 1972 construction began on the new 'Fleet line'. Economic pressures, and doubt over the final destination of the line, had led to a staged approach. The first stage comprised thus:

  • A takeover of the Bakerloo line between Stanmore and Baker Street.
  • A new tube between Baker Street and Charing Cross, thereby relieving pressure on the West-end section of the Bakerloo south of Baker Street.

The new tube was to offer cross-platform interchange between the Bakerloo and Fleet at Baker Street, as pioneered on the Victoria line. Work began in 1972, and was completed in 1979. As part of the works, Trafalgar Square (Bakerloo) and Strand (Northern) stations were to be combined into a single station complex, Charing Cross. The existing Charing Cross station on the sub-surface District and Circle lines was to be renamed Embankment.

History

The line opened on 1 May 1979, taking over one of the Bakerloo line's two branches to relieve congestion on their common portion. The Baker Street to Stanmore branch was joined to a new 2.5 mile (4 kilometre) segment into central London, terminating at a new station at Charing Cross. The previous Charing Cross station, on the Circle, District, Bakerloo and Northern lines, was renamed Embankment. The new Charing Cross tube station created a new interchange, amalgamating the stations of Strand on the Northern line and Trafalgar Square on the Bakerloo. The new line was to have been called the Fleet line after the River Fleet, but the project was renamed for Queen Elizabeth II's 1977 Silver Jubilee following a pledge made by the Conservatives in the Greater London Council election of 1977. The original choice of battleship grey for the line's colour was based on the naval meaning of the word fleet; this became a lighter grey, representing the silver colour of the Jubilee itself. The Fleet line was mentioned in a 1965 Times article, discussing options after the Victoria line had been completed — suggesting that the Fleet line could take a Baker Street-Bond Street-Trafalgar Square-Strand-Fleet Street-Ludgate Circus-Cannon Street route, then proceeding into south-east London. [1] The Jubilee line of 1979 was to be the first phase of the project, but lack of funds meant the line stayed the same until the late 1990s. Phase 2 would have extended the line along Fleet Street to stations at Aldwych, Ludgate Circus, Cannon Street, Fenchurch Street, St Katharine Docks, Wapping and then under the River Thames to New Cross, terminating at Lewisham with the potential of taking over the National rail services to Hayes. An alternative plan was created in the late 1970s to extend the Jubilee line in parallel with the River Thames, this would have taken the line from Wapping to Thamesmead Via Surrey Docks North, Canary Wharf, North Greenwich, Custom House, Silvertown, Woolwich Arsenal and to Thamesmead. However the 'River line' extension as it was called was deemed too expensive and construction of the extension never proceeded. Changes in land use, particularly the urban renewal of the Docklands area, caused the project to extend the line beyond Charing Cross to change considerably in the 1990s. The Jubilee Line Extension, opened in three stages in 1999, split from the existing line at Green Park, creating a one-station branch to Charing Cross, which is now closed (although it is still maintained for occasional use as a film set). With the extension in place, the Jubilee line is the only line on the London Underground network that has interchanges with all other lines.

Rolling stock

Diagram of a 1996 tube stock driving car
Diagram of a 1996 tube stock driving car
Diagram of a 1996 tube stock trailer car
Diagram of a 1996 tube stock trailer car
1996 tube stock at Stratford Station
1996 tube stock at Stratford Station

When the Jubilee line was opened, it was operated by 1972 stock. In 1984 this was partially replaced by the new 1983 Stock, the displaced 1972 Stock being transferred to the Bakerloo line. The 1983 Stock proved to be unreliable and troublesome in service, with single-leaf doors making passenger loading and unloading a slower process than on other stock with wider door openings. With the construction of the Jubilee line Extension, the opportunity was taken to introduce new trains, and today the line is worked by 1996 stock, which is similar to the 1995 Stock in use on the Northern line. The new stock has internal displays and automated announcements to provide passengers with information on the train's route - at first they simply listed the destination of the train, and subsequently also listing the name of the next station and interchanges there. Subsequent modifications also made the text scroll across the internal display instead of just appear in it.

The 2005 upgrade

The Jubilee line closed for a five-day period starting on 26 December 2005 in order to add an extra carriage to each of the six-car trains. The line had to be closed while this work was done as six and seven car trains could not run in service at the same time because the platform edge doors at JLE stations could not cater for both train lengths simultaneously. Additionally, an extra four complete trains were added to the fleet, bringing the total to 63. The result is a 17% increase in capacity at peak times, allowing 6,000 more passengers per day to use Jubilee line services. The signalling system was also upgraded. Work was completed and the line reopened two days ahead of schedule, on 29 December 2005.

Future

The line is scheduled to switch to automatic train operation in 2009, using the SelTrac system currently on in use on the Docklands Light Railway.[2] Equipment installation and testing for this began in late 2006.

Map

Geographical path of the Jubilee line


Stations

Jubilee Line
uACCa
Stanmore
leer uSTR uKDSa
Stanmore sidings
leer uABZrg uSTRrf
uHST
Canons Park
uHST
Queensbury
uHST
Kingsbury
uACC
Wembley Park for Metropolitan Line
uHST
Neasden
uHST
Dollis Hill
uHST
Willesden Green
uACC
Kilburn
uBHF
West Hampstead for National Rail
uBHF
Finchley Road for Metropolitan Line
uTUNNELa
utHST
Swiss Cottage
utHST
St. John's Wood
utBHF
Baker Street for Bakerloo/Circle/H&C/Met Lines
utBHF
Bond Street for Central Line
utBHF
Green Park for Piccadilly/Victoria Lines
utSTRrg utABZrf leer
Green Park Junction
utSTR utKBFe leer
Charing Cross (service ended 1999. Retained for storage or emergencies)
utSTR utENDEe leer
Line ends short of Aldwych
utSTRlf utSTRlg leer
utACC
Westminster for Circle/District Lines
utACC
Waterloo for National Rail and Bakerloo/Northern/W&C Lines
utACC
Southwark for Waterloo East
utACC
London Bridge for National Rail and Northern Line
utACC
Bermondsey
utACC
Canada Water for East London Line
utACC
Canary Wharf for Docklands Light Railway
utACC
North Greenwich for The O2
uTUNNELe
uACC
Canning Town for Docklands Light Railway
uACC
West Ham for National Rail and District/H&C Lines
leer uABZrg uKDSl
Stratford Market Depot
uACCe
Stratford for National Rail and Central Line/DLR

Surface section

Tunnel section

Surface section

Gallery

References

  1. ^ More Tube Lines Discussed. The Times. April 27, 1965.
  2. ^ Tube Lines, Network tests for new signalling systems, Tube Lines, 24-08-2005.

External links


West: Crossings of the River Thames East:
Westminster Bridge Between Westminster
and Waterloo
Bakerloo Line
between Embankment
and Waterloo
Rotherhithe Tunnel Between Canada Water
and Canary Wharf
Greenwich foot tunnel
Docklands Light Railway
between Island Gardens
and Cutty Sark
Between Canary Wharf
and North Greenwich
Blackwall Tunnels
Blackwall Tunnels Between North Greenwich
and Canning Town
Thames Barrier

View More Summaries on Jubilee line
 
Ask any question on Jubilee line and get it answered FAST!
Answer questions in BookRags Q&A and earn points toward
discounted or even FREE Study Guides and other BookRags products!
Learn more about BookRags Q&A
Copyrights
Jubilee line from Wíkipedia. ©2006 by Wíkipedia. Licensed under the GNU Free Documentation License. View a list of authors or edit this article.

Article Navigation
Join BookRagslearn moreJoin BookRags




About BookRags | Customer Service | Report an Error | Terms of Use | Privacy Policy