BookRags.com Literature Guides Literature
Guides
Criticism & Essays Criticism &
Essays
Questions & Answers Questions &
Answers
Lesson Plans Lesson
Plans
My Bibliography Periodic Table U.S. Presidents Shakespeare Sonnet Shake-Up
Research Anything:        
History | Encyclopedias | Films | News | Create a Bibliography | More... Login | Register | Help

Heydar Aliyev International Airport

Print-Friendly
About 2 pages (620 words)

Bookmark and Share Questions on this topic? Just ask!
Heydar Aliyev International Airport
Heydər Əliyev adına beynəlxalq aeroportu
IATA: GYD – ICAO: UBBB
Summary
Airport type Civilian
Operator Civil government
Serves Baku
Elevation AMSL 3 m / 10 ft
Coordinates 40°28′3″N, 50°2′48″E
Website http://www.airport-baku.com/
Runways
Direction Length Surface
m ft
16/34 2,700 8,858 Asphalt
18/36 3,200 10,499 Concrete

Heydar Aliyev International Airport (IATA: GYDICAO: UBBB) (former Bina International Airport, Azerbaijani: Heydər Əliyev adına beynəlxalq aeroportu) is a main international airport in Azerbaijan located 25 kilometers (16 miles) east of the capital Baku. Being the busiest in the Caucasus, the airport is the home of Azerbaijan Airlines, the national flag carrier. The airport has been renamed after former Azeri leader, Heydar Aliev in 1999 and its IATA code has been changed (the former IATA code was BAK). The airport houses the Baku Cargo Terminal.

Contents

Appearance

The design and project management work was carried out by British company APM Ltd and the Building and Civil Works for the project by the Turkish consortium, Burc/Enka. In addition, Thomson-CSF Airsys ATM was awarded a $19 million contract to supply and install equipment for the renovation of the terminal building. The project to renovate the airport started at the beginning of 1998 and was completed in June 1999. The building comprises four modules, which operate as two terminals (north and south). One of them is used for domestic and CIS passengers and cargo, and the other one for international passengers and cargo. The renovation, which took place in 2 phases, was funded by a group of international banks. Phase 1 worked on the north terminal and Gate 1 and was completed in March 1999. Phase 2, which consisted of the south terminal and administration offices, was completed in June. The first paved runway has the magnetic course 335-155 and the 60 m width, the second runway's magnetic course is 335-175 and a width is 45 m. The paved runways are ready to receive aircraft and helicopters under meteorological minimum established by ICAO. There are high intensity lights for the first paved runway and low intensity lights for the second one.[1] Three taxiways are situated nearby. The special emergency rescue team provides in shifts 24 hours service. The team includes Mi-8 helicopter, high flotation vehicle equipped with short wave and ultrahigh short wave radio station, motor-car lift crane, BelAZ towing tractor, iron ski, hydraulic elevators, safe blocks and standard tows, applicable to all types of aircraft based at the aerodrome.[1]

Airlines and destinations

The following airlines have scheduled services to Heydar Aliyev International Airport as of March 2007:

Notes

  1. ^ a b Baku Cargo Terminal. Retrieved on 2007-11-16.

External links

View More Summaries on Heydar Aliyev International Airport
 
Ask any question on Heydar Aliyev International Airport and get it answered FAST!
Answer questions in BookRags Q&A and earn points toward
discounted or even FREE Study Guides and other BookRags products!
Learn more about BookRags Q&A
Copyrights
Heydar Aliyev International Airport from Wíkipedia. ©2006 by Wíkipedia. Licensed under the GNU Free Documentation License. View a list of authors or edit this article.

Article Navigation
Join BookRagslearn moreJoin BookRags




About BookRags | Customer Service | Report an Error | Terms of Use | Privacy Policy